Anova

billyb

New member
Joined
Sep 13, 2012
Messages
13
NEVERMIND FIGURED IT OUT
I am having trouble with this problem. My answers were off. All help appreciated.

To test whether the mean time needed to mix a batch of material is the same for machines produced by three manufacturers, the Jacobs Chemical Company obtained the following data on the time (in minutes) needed to mix the material. Use these data to test whether the population mean times for mixing a batch of material differ for the three manufacturers. Use = .05.



1. =

2. SSTR =

3.
MSTR =

4. SSE = (2 digits to the right of the decimal)

5. MSE = (2 digits to right of decimal)

6. F = (2 digits to right of decimal)


 
Last edited:
Top