Dan Wilson
New member
- Joined
- Dec 7, 2017
- Messages
- 4
Am I being short changed? I am required to deliver various parts to multiple work stations. I must stop at each station on my 1st of 3 loops and only at stations that require parts on my 2nd and 3rd loop. At one particular station there are 3 separate parts used there. Part #1 requires .27 containers per day, part #2 requires .12 container per day and part #3 requires .06 containers per day. I am paid for 1.3 stops per day based on the following calculation.
1+.45-.45/3=1.3
Where,
1=mandatory 1stop
.45=total #of containers required per day
3=# of trips per day
Does this calculation accurately represent the number of stops I am likely to make at this station each day?
As the containers are likely to be delivered on different loops, shouldn't they be considered separately vs the total?
Tanks,
Dan
1+.45-.45/3=1.3
Where,
1=mandatory 1stop
.45=total #of containers required per day
3=# of trips per day
Does this calculation accurately represent the number of stops I am likely to make at this station each day?
As the containers are likely to be delivered on different loops, shouldn't they be considered separately vs the total?
Tanks,
Dan