Hi all,
I have a problem in a project I am doing and was wondering if anyone has a formula to work out the following problem.
If I have a starting point of 2600kgs/per hour of product being made and it took 30 minutes to increase the production to 3000kgs, how much extra kgs would i have produced if if it only took me 5 mins to reach 3000kgs.
is there a calculation i can use to alter the kgs or time and come to a answer in extra kgs produced.
Thanks to anyone who reply's to this.
I have a problem in a project I am doing and was wondering if anyone has a formula to work out the following problem.
If I have a starting point of 2600kgs/per hour of product being made and it took 30 minutes to increase the production to 3000kgs, how much extra kgs would i have produced if if it only took me 5 mins to reach 3000kgs.
is there a calculation i can use to alter the kgs or time and come to a answer in extra kgs produced.
Thanks to anyone who reply's to this.