Saif ur Rehman
New member
- Joined
- Feb 25, 2016
- Messages
- 1
I work in dispatch hall of a bike factory.
At factory we assemble one bike per 18 seconds. so i receive one bike after each 18 seconds. We have to put covering on bike before dispatch and we take 26 seconds to put a cover on bike
Bikes are coming 8 seconds faster then delivery, so definitely stock of bikes will keep increasing,
We produce 500 bikes per day, what is maximum space required for dispatch hall.
At factory we assemble one bike per 18 seconds. so i receive one bike after each 18 seconds. We have to put covering on bike before dispatch and we take 26 seconds to put a cover on bike
Bikes are coming 8 seconds faster then delivery, so definitely stock of bikes will keep increasing,
We produce 500 bikes per day, what is maximum space required for dispatch hall.