moosie2323
New member
- Joined
- Sep 26, 2008
- Messages
- 15
A sawmill produces 8 ft long wall studs. The maximum desirable percent error for the lengths of the studs is 0.005. What range of lengths of studs is allowable?
To answer use this question use the formula E>or equal to |a-e| over e
How would I set the problem up?
To answer use this question use the formula E>or equal to |a-e| over e
How would I set the problem up?