A city is paving a bike path. The same length of path is paved each day.

Ediebuglolgtg

New member
Joined
Nov 15, 2015
Messages
1

[h=1] A city is paving a bike path. The same length of path is paved each day. After 4 days, there are 8 miles of path remaining to be paved. After 6 more days, there are 5 miles of path remaining to be paved. Write an equation that gives the distance(in miles) remaining to be paved as a function of the number of days since the project began. :?:[/h]
 

A city is paving a bike path. The same length of path is paved each day. After 4 days, there are 8 miles of path remaining to be paved. After 6 more days, there are 5 miles of path remaining to be paved. Write an equation that gives the distance(in miles) remaining to be paved as a function of the number of days since the project began. :?:

What are your thoughts?

Please share your work with us ...even if you know it is wrong

If you are stuck at the beginning tell us and we'll start with the definitions.

You need to read the rules of this forum. Please read the post titled "
Read before Posting" at the following URL:

http://www.freemathhelp.com/forum/th...Before-Posting
 
After 4 days, there are 8 miles of path remaining to be paved. After 6 more days, there are 5 miles of path remaining to be paved.
So how many miles did they pave during those six days? (Hint: Subtract.)

So how many miles did they pave each day? (Hint: Divide.)

Since this is your rate of change, what is your slope?

Write an equation that gives the distance(in miles) remaining to be paved as a function of the number of days since the project began.
You are given that, on day t = 4, you have d = 8 miles left. With this data point and the slope you derived above, what is the equation of the straight-line model? ;)
 
Top