Apologies if this is in the wrong section, I wasn't sure where to put it. A cement mixture calls for cement, sand and water in the ratio of 1:2:4.
If there is 8kg of water, how much concrete will the mix make? Based on that I can work out how much of the other ingredients there are, 2kg cement, 4kg sand and 8kg water. How do I figure out how much concrete the mix can make tho? If they said ''if this amount of cement, sand and water makes this much concrete, how much concrete can you make if you have 8kg water'', then I could work it, but how can I do it without any reference point, i am confused...
If there is 8kg of water, how much concrete will the mix make? Based on that I can work out how much of the other ingredients there are, 2kg cement, 4kg sand and 8kg water. How do I figure out how much concrete the mix can make tho? If they said ''if this amount of cement, sand and water makes this much concrete, how much concrete can you make if you have 8kg water'', then I could work it, but how can I do it without any reference point, i am confused...